US$ 173.50
therasoft.com
10-09: Plume Abatement - The Next Generation
Description
10-09: Plume Abatement - The Next GenerationCooling towers have been modified to reduce the visibility of their effluent water vapor plumes for about 40 years. The evolution, breadth of experience and technologies of plume abatement cooling towers will be described. An evolutionary improvement to existing plume abatement designs using a different heat transfer approach will be described, including some of the development and demonstration achievements to date. Differences from currently used
The model was used to understand the main phenomenon leading to ice transport and accumulation
corrosion rates were higher than desired
elimination of chemical container disposal issues and is environment all safe
bromide-activated planktonic bacteria
two field case studies will be presented
Advantages and disadvantages will be discussed and case histories cited
other first cost items which vary between one bid and another
The ISO 9001 quality system originated in 1987 and has evolved since its inception becoming the standard quality system for the world
150) standard only recommends the use of mechanically-aspired psychrometers
long standing program for thermal capability certification of factory assembled towers
is placed in contact with water or a solution containing electrolytes
This paper discusses some of these problems and their circumvention
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 23 - Jul 28
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
US$ 77.00
US$ 191.00
US$ 172.50
US$ 254.00
US$ 207.50
US$ 91.00
US$ 122.00
US$ 174.50
US$ 57.00
US$ 163.00
US$ 110.00
US$ 146.00
US$ 114.50